New Step by Step Map For screw conveyor
There are two troubles in simulating the buildup of sludge residue: estimating sludge residue thickness and its linked permeability once the system is fed. Inside the one particular-dimensional product formulated by Tan (2016), an equation proposed by Abboud (1993), which assumed that the inner structure of freshly formed and present sludge reside